No. |
Equipment |
ECM Name |
1
2
3
4
5
6
7
8
9
10
11
12
|
Boiler |
Cleaning and Beating surface
change boiler accessories
Boiler efficiency control (Adjusting excess air)
Water treatment
Reduce blowdown
Preheat feed water
Reduce steam pressure
Preheat air to boiler
Change grade of fuel oil
Use steam instread of electricity for preheating fuel oil
Insulate the boiler and accessories
Change to higher efficient boiler |
13
14
15
16
17
19
20
21
22
|
Steam usage |
Insulate steam accessories
Check and repair leakage
Check, repair and install steam trap
Modify transfering of steam
Adjust steam pressure by instaling of PRV
Adjust steam temperature by installing steam regulator
Reduce steam loss by automatic control
Modify direct steam heating
Change direct steam heating to indirect steam heating |
23
24
|
Recover waste heat |
"Recover heat from heat source e.g. condensate, blowdown,
exhaust air, refrigerant,waste water, flash steam, waste steam"
"Apply recovered heat to heat sink e.g. boiler feed water,air inlet for combustion or process, process water, preheat fuel oil"
|
25
26
27
28
29
30
31
32
|
Burner |
Improve combustion
Preheat air to burner
Preheat raw material
Insulate the burner
Reduce mass and heat content of truck or container
Use cooling air of tunnel kiln for combustion air
Install recuperator
Reduce the leakage of hot gas |
33
34
35
36
|
Changing source
of energy |
change to lignite
change to natural gas
change to agricultural material
change to renewable energy (solar energy or biomass) |
37
38
|
Peak demand or Load management |
Load management
Reduce peak demand by using automatic demand controller |
39
|
Power factor |
Install capacitor with automatic control |
40
41
42
43
|
Transformer |
Reduce number of transformer
Optimize the size of transformer
Optimize the voltage use of transformer
Optimize the size of transformer wire |
44
45
46
47
48
|
Motor |
Change to higher efficient motor
Use VSD (with software ASD Master)
Optimize the size of the motor
Use motor controller (for soft start and load control)
Modify motor operation |
49
50
51
|
Generator |
Optimize the size of the generator
Use generator controller
Modify generator operation |
52
53
54
55
56
57
|
Lighting |
Reduce the number of lamp
Change to higher efficient lamp
Change to low loss / electronic ballast
Use the reflector, fixture or luminaire
Lighting control system e.g. timing, occupancy detector
Light save |
58
59
60
61
62
63
64
65
66
|
Air conditioning |
Repair the leakage of the system
Change to higher efficient air conditioning machine
Insulate air conditioned area and the air conditioning system
Improve shadding
Use air to air heat exchanger
Use glass with film filter
Use double laminate glass
Use heat reclaim system
Analysis air condition operation (HDCS software) |
67
68
69
70
|
Air compressor |
Check and repair the leakage of the system
Reduce the pressure suitable for the load
Change to higher efficient air compressor
Air compressor operation |
71
72
73
74
75
76
|
EE heater |
Insulate EE heater
Improve EE heater operation
Improve EE welding machine
Change to higher efficient EE heater system
Electric IR
Micro wave heating |
77
78
79
80
81
82
83
84
|
Chiller |
Insulate the chiller and piping system
Clean the condenser, cooling tower and freezer
Use chilled water system
Heat recovery from refrigerant
Frigaid
Absorption chiller
refrigerant replacement
Use control system for operation |
85
86
|
Electricity generating
and Cogeneration |
Electricity generating with Gasifier
Cogeneration system |
87
88
89
90
91
|
Other measures |
Harmonic cancelation
Voltage regulator
Power quality
Heat pump
Radio frequency |
92
93
94
95
96
|
Process and productivity
improvement |
High efficient waste water treatment
Membrane filtration
Ozone
Freeze concentration
Humidity control |
97
|
Energy Management System |
Energy management system |