Thai English
 
Username
Password
Login as
 
 
 
 
   Email Address  
 
   
 
 
   
 


No. Equipment ECM Name
1
2
3
4
5
6
7
8
9
10
11
12
Boiler
Cleaning and Beating surface
change boiler accessories
Boiler efficiency control (Adjusting excess air)
Water treatment
Reduce blowdown
Preheat feed water
Reduce steam pressure
Preheat air to boiler
Change grade of fuel oil
Use steam instread of electricity for preheating fuel oil
Insulate the boiler and accessories
Change to higher efficient boiler
13
14
15
16
17
19
20
21
22
Steam usage
Insulate steam accessories
Check and repair leakage
Check, repair and install steam trap
Modify transfering of steam
Adjust steam pressure by instaling of PRV
Adjust steam temperature by installing steam regulator
Reduce steam loss by automatic control
Modify direct steam heating
Change direct steam heating to indirect steam heating
23

24
Recover waste heat
"Recover heat from heat source e.g. condensate, blowdown,
exhaust air, refrigerant,waste water, flash steam, waste steam"
"Apply recovered heat to heat sink e.g. boiler feed water,air inlet for combustion or process, process water, preheat fuel oil"
25
26
27
28
29
30
31
32
Burner
Improve combustion
Preheat air to burner
Preheat raw material
Insulate the burner
Reduce mass and heat content of truck or container
Use cooling air of tunnel kiln for combustion air
Install recuperator
Reduce the leakage of hot gas
33
34
35
36
Changing source
of energy
change to lignite
change to natural gas
change to agricultural material
change to renewable energy (solar energy or biomass)
37
38
Peak demand or Load management
Load management
Reduce peak demand by using automatic demand controller
39
Power factor
Install capacitor with automatic control
40
41
42
43
Transformer
Reduce number of transformer
Optimize the size of transformer
Optimize the voltage use of transformer
Optimize the size of transformer wire
44
45
46
47
48
Motor
Change to higher efficient motor
Use VSD (with software ASD Master)
Optimize the size of the motor
Use motor controller (for soft start and load control)
Modify motor operation
49
50
51
Generator
Optimize the size of the generator
Use generator controller
Modify generator operation
52
53
54
55
56
57
Lighting
Reduce the number of lamp
Change to higher efficient lamp
Change to low loss / electronic ballast
Use the reflector, fixture or luminaire
Lighting control system e.g. timing, occupancy detector
Light save
58
59
60
61
62
63
64
65
66
Air conditioning
Repair the leakage of the system
Change to higher efficient air conditioning machine
Insulate air conditioned area and the air conditioning system
Improve shadding
Use air to air heat exchanger
Use glass with film filter
Use double laminate glass
Use heat reclaim system
Analysis air condition operation (HDCS software)
67
68
69
70
Air compressor
Check and repair the leakage of the system
Reduce the pressure suitable for the load
Change to higher efficient air compressor
Air compressor operation
71
72
73
74
75
76
EE heater
Insulate EE heater
Improve EE heater operation
Improve EE welding machine
Change to higher efficient EE heater system
Electric IR
Micro wave heating
77
78
79
80
81
82
83
84
Chiller
Insulate the chiller and piping system
Clean the condenser, cooling tower and freezer
Use chilled water system
Heat recovery from refrigerant
Frigaid
Absorption chiller
refrigerant replacement
Use control system for operation
85
86
Electricity generating
and Cogeneration
Electricity generating with Gasifier
Cogeneration system
87
88
89
90
91
Other measures
Harmonic cancelation
Voltage regulator
Power quality
Heat pump
Radio frequency
92
93
94
95
96
Process and productivity
improvement
High efficient waste water treatment
Membrane filtration
Ozone
Freeze concentration
Humidity control
97
Energy Management System
Energy management system
 
 


 

  HOME ABOUT US OUR SERVICES OUR PORTFOLIO NEWS & EVENTS CONTACT US CAREER  
        Vision - Mission
    Message from MD
    Company Profile
    Management
    VDO Presentation
    What others talk about us
    World Class Partners
    What is ESCO
    Why EEI
    ESCO Guaranteed
    ESCO Shared Savings
    ECM
 

Copyright ©2009 Excellent Energy International Co., Ltd. (EEI : Energy Service Company) All rights reserved.